At the "Meielen" site in Zollikofen, an administrative building is being set up for the Federal Department of Foreign Affairs (DFA). of the federal government with about 1,000 jobs. The construction project is managed by the BBL as responsible building authority.
The following goals should be achieved with change management:
- the cadre and the employees EDA (Directorate for Resources, Directorate for Development and Cooperation, Competence Center Contracts and Procurement) are professional on the move to the new administrative building. prepared. The acceptance for the upcoming change is thereby increased,
- the construction project enables an optimal operational process and is the basis for a good cooperation of the employees EDA based on the modern forms of work,
- The processes of cooperation within the FDFA and the relevant directorates are optimized and the necessary structures integrated into the construction project.
BKP 558 Change Management (Project Management)
At the "Meielen" site in Zollikofen, an administrative building is being set up for the Federal Department of Foreign Affairs (DFA). of the federal government with about 1,000 jobs. The construction project is managed by the BBL as responsible building authority.
The following goals should be achieved with change management:
- the cadre and the employees EDA (Directorate for Resources, Directorate for Development and Cooperation, Competence Center Contracts and Procurement) are professional on the move to the new administrative building. prepared. The acceptance for the upcoming change is thereby increased,
- the construction project enables an optimal operational process and is the basis for a good cooperation of the employees EDA based on the modern forms of work,
- The processes of cooperation within the FDFA and the relevant directorates are optimized and the necessary structures integrated into the construction project.
BKP 558 Change Management (Project Management)