The construction project involves the construction of a two- and four-storey, non-basement massive building (reinforced concrete) with the external dimensions 120 x 35 m, including all associated technical installations and outdoor facilities, as well as the construction of a new park pallet as a multi-storey above-ground garage with 210 parking spaces ,
It is a 24-meter-long one-storey bridge structure in steel skeleton construction with glass facade. The bridge connects the new MFG building with an existing building. The work also includes the manufacture of 2 reinforced concrete wall panels, foundation of micro-bored piles, breakthrough to existing construction, removal of the bridge, roof sealing work, expansion in the connection area of the existing building and facade work on the existing building.