Heating and plumbing work 1.BA
Plumbing:
- 6 pieces of sanitary objects
- 1 tankless water heater
- approx. 55 m sewage pipe DN 50 to DN 100
- approx. 196 m pipelines DN 15 to DN 50
- 1 piece lifting station
- 16 pieces of various valves DN 15 to DN 50
- 1 piece of water softener
- approx. 96 m thermal insulation
- approx. 18 m Rohrschottungen
Heating equipment:
- 25 pieces of radiators and convectors
- approx. 1080 m pipelines DN 15 to DN 65
- 113 valves DN 15 to DN 65
- 1 heater distributor
- 5 heating pumps
- approx. 626 m thermal insulation
- approx. 69 m Rohrschottungen
- approx. 255 m of electrical cable
Special features regarding the execution deadlines:
BA 1 Library to central aisle 15.4.2024 to 15.11.2024;
BA 1 Aula 15.08.2024 to 28.02.2025