Heating, ventilation, plumbing.
Sewage, water, gas systems
- 310 m sewage pipe HD;
- 1 pc double lifting system 300 l container;
- 2 small lifting systems with floor drain;
- 1 150 m water pipe stainless steel without ISO;
- 40 water fittings;
- 61 small instantaneous water heaters approx. 6 kW;
- 2 x instantaneous water heaters 11 KW;
- 55 wash basins;
- 4 St. Disabled WT including assembly element;
- 31 pc. Toilet facilities incl. Assembly element;
- 4 handicapped toilets incl. Assembly element;
- 2 pc shower systems incl. Assembly element;
- 6 pcs. Kitchen connections including assembly element;
- 8 urinals incl. Assembly element;
Heat generation systems
- 2 pc connection to district heating station;
- 2 750 m steel pipes up to DN 50 without ISO;
- 400 m steel pipes up to DN 100 without ISO;
- 61 fittings;
- 117 radiators;
- 2 100 m
Ventilation systems
- 1 pc ventilation system 2 zones approx. 35 000 m
- 2 smoke extraction fans;
- 4 pc exhaust air systems / roof fans WC;
- 2 ventilation systems approx. 2 500 m
- 1 pc refrigeration system RLT;
- 7 air conditioning split units 3.0 KW;
- 1 700 m
- 710 m spiral duct up to DN 280;
- 81 round fire dampers;
- 113 pieces of fire dampers, square;
- 187 round flow controller;
- 24 pcs. Square flow controller;
- 160 pc outlets / inlets;
- 186 round silencers;
- 51 pieces square silencer.