The mandate of the overall project management, project planning, tendering and site management is described. Process engineering for phases 3-5 acc. Performance Model SIA 112, 2014 edition. Phase 3.1 is triggered. Scope: Complete replacement of burner & boiler OL2; Adaptation E-filter 2; Conversion of flue gas cleaning OL2 according to energetic aspects and compliance with today's emissions; Extension boiler house around the area; Extension of energy center for additional installation Turbine group; Installation of new turbine group; Extension / redesign of air condensation plant; necessary replacement of electrical and control equipment (EMSR); Expansion of storage capacities incl. Combined crane system and offset baler; Precautionary planning taking into account possible process steam delivery; Retrofit firing / boiler OL1 (FLR, checking steam parameters, excess air, etc.); rolling retrofit E-filter 1; Adaptation of flue gas cleaning OL1 to the same level as OL2; Expenses replacement cpl. EMSR.
The mandate of the overall project management, project planning, tendering and site management is described. Process engineering for phases 3-5 acc. Performance Model SIA 112, 2014 edition. Phase 3.1 is triggered. Scope: Complete replacement of burner & boiler OL2; Adaptation E-filter 2; Conversion of flue gas cleaning OL2 according to energetic aspects and compliance with today's emissions; Extension boiler house around the area; Extension of energy center for additional installation Turbine group; Installation of new turbine group; Extension / redesign of air condensation plant; necessary replacement of electrical and control equipment (EMSR); Expansion of storage capacities incl. Combined crane system and offset baler; Precautionary planning taking into account possible process steam delivery; Retrofit firing / boiler OL1 (FLR, checking steam parameters, excess air, etc.); rolling retrofit E-filter 1; Adaptation of flue gas cleaning OL1 to the same level as OL2; Expenses replacement cpl. EMSR.