Extension of the METIS Energy Model and Conducting Studies Demonstrating the Upgrades | Tenderlake

Extension of the METIS Energy Model and Conducting Studies Demonstrating the Upgrades

Contract Value:
EUR 3M - 3M
Notice Type:
Contract Notice
Published Date:
05 September 2023
Closing Date:
06 October 2023
Location(s):
BE100 Arr. de Bruxelles-Capitale/Arr. van Brussel-Hoofdstad (BE Belgium/BELGIQUE-BELGIË)
Description:
Extension of the METIS Energy Model and Conducting Studies Demonstrating the Upgrades

METIS is a mathematical model simulating the operation of the European electricity and gas systems and markets on an hourly basis over a year. The addition of hydrogen as an energy carrier have allowed using the model in the impact assessment for revised gas markets and hydrogen directive and regulation. Further ongoing developments address the better integration of demand with supply sectors and a finer regional granularity. In order to secure the model in future policy cycles, extensions would be necessary along the following three dimensions:

1. a representation of energy markets including the behaviour of buyers and sellers;

2. the inclusion of all demand sectors including a linkage of demand in these sectors to economic activity as represented by macro-economic models;

3. the interaction with energy systems outside the EU that have a key impact on the EU energy system, e.g. via exports of electricity, gas and hydrogen.

Extension of the METIS energy model and conducting studies demonstrating the upgrades.

Download full details as .pdf
The Buyer:
European Commission, Directorate-General for Energy (ENER), ENER.A.4 – Chief Economist
CPV Code(s):
71621000 - Technical analysis or consultancy services
72300000 - Data services