Earthworks, road construction and pipe-laying work
- Remove 720 m2 of asphalt surface and restore it in 2 layers
- 1,300 m3 of excavated pipe trench for canal
- 400 m of pipe trench for ADL + TWL and backfilling
- 625 m Steinzeugrohr DN 10/200
- 45 m PE-RC pipe 225 x 13.4 supply and draw-in
- 36 m PE-RC pipe 355 x 32.2 as thermowell in HDD process
- 13 St Kontrollschächte DN 1000
- 14 St Kanalsystemschächte DN 400