the desired project management mission includes all phases of the MOP law (integrated into the CCP, article R2431-1) from the "diagnosis" phase to the "accompaniment to reception operations" phase. The project management missions of this contract include a firm tranche (DIA phase to Aor phase), including the OPC mission and an optional tranche (ISS phase). There are no plans to design an extension under this contract
The rehabilitation work program includes the complete thermal insulation of the building envelope (vertical walls, exterior joinery, roofs and roofs, including the reinforcements induced at the level of the slab and timber frame structures), the consolidation of the foundation of the building extension, the accessibility, the acoustic treatment of the large hall, the upgrading to smoke extraction standards, the replacement of VMC wet rooms, the replacement of lighting, the repair of exterior concrete and the replacement of rainwater downspouts, painting on the cladding and the treatment of the sign, interior paintings, functional rehabilitation of the changing rooms, renovation of the floor of the large hall, replacement of sanitary equipment, .