New construction of a branch of the Graf-zu-Bentheim-Schule, special focus on vision and further funding needs with day care center and early intervention / therapeutic center.
- New installation of the heat supply system consisting of a gas heat pump cascade in connection with a gas condensing cascade,
- New installation of the entire heat distribution network consisting of approx. 1 200 m steel pipe DN 15- 80 and approx. 650 m metal composite pipe DN15- 32,
- Heat transfer through radiators approx. 42 pieces and underfloor heating approx. 2,000 m
- Creation of approx. 30 core holes up to d150 mm in masonry and / or concrete walls.