Electrical work for the Protestant Campus Nuremberg.
The construction project includes the renovation and expansion of the former Oberpostdirektion Nuremberg from the 1970s.
in the northwest of the old town of Nuremberg. The building is not a listed building.
The renovation of the existing building affects all components, the extension is carried out by means of additional storeys above components A
(2 storeys) and C (3 storeys).
ca. 100 St Elektroverteilungen
10 pcs Elektro-HV
approx. 200,000 m of wires and cables
approx. 25,000 m of installation pipes/ducts
approx. 5,000 m of cable trays and gutters
approx. 5,000 pcs switches and sockets
approx. 1,000 pcs of fire partitions and wall penetrations
approx. 200,000 m of telecommunication lines and signal cables
3 St Brandmeldezentrale, ca. 600 Melder, ca. 1,000 Alarmtongeber
1 x PA control panel (SAA), approx. 600 LSP
1 St BOS-Objektfunkanlage
approx. 10,000 pcs luminaires
1 piece KNX system with approx. 2,000 sensors
1 pc sun protection system with central control, approx. 1,000 TLN
1 hour emergency/safety lighting system, approx. 1,000 luminaires
1 pc EDP network with approx. 4,000 connections and approx. 70 data distributors