The construction project "Extension of the Caspar-Voght-Schule Rellingen (CVE)" is the construction of another school building to the existing buildings of the primary and community school Rellingen. The school's property is located at Schulweg 2 in 25462 Rellingen in the state of Schleswig-Holstein. The planned school building is to be erected with a floor area of approx. 756 m2. It consists of three floors (ground floor, 1st and 2nd floor) and has no basement. The maximum building dimensions of the rectangular structure are approx. 42 x 18 x 12 m in length x width x height.
Coating of wall surfaces in the building:
- approx. 2000 m2 of filling in Q3 on gypsum boards,
- approx. 2000 m2 initial coating with emulsion paint on gypsum boards
- approx. 1600 m2 initial coating with emulsion paint on gypsum plaster mortar
- approx. 100 m2 initial coating with emulsion paint on concrete/masonry
- Approx. 450 m2 coloured settling according to colour concept
Coating of ceiling surfaces in the building:
- approx. 140 m2 initial coating with emulsion paint on gypsum boards (smooth)
- approx. 340 m2 initial coating with emulsion paint on gypsum boards (perforated)
- approx. 1400 m initial coating of friezes with emulsion paint on gypsum boards
Coating of floor surfaces in the building:
- individual rooms
Painting work in the building:
- approx. 70 enclosing frames coated with alkyd resin varnish (colour concept)
-individual stair railings.