Restructuring of the market at Elisabethplatz - new building Elisabethmarkt_LV 111 Trockenbau

Restructuring of the market at Elisabethplatz - new building elisabethmarkt:

open procedure for the establishment of a new permanent market (Elizabeth Market) with 10 market buildings with a total of 22 sales units,

as a ground-floor (single-storey) building.

LV 111 Drywall work:

Construction process/ construction/ interfaces The construction site of the Elisabethmarkt in the Maxvorstadt in Schwabing is located in an inner-city situation with limited space on the construction site and in the immediate vicinity. Attention should be paid to the cramped or inner-city location, a neighboring construction site, surrounding schools and trees worth protecting.

The subject of this service is drywall works.

Amounts:

waterproofing against rising damp, bitumen welding membrane G200S4 : approx. 42 m2;

Metal single-stud walls, plaster boards type H2 on both sides : approx. 80 m2;

Metal double stud walls, plaster boards type H2 on both sides : approx. 15 m2;

Single metal stud facing shells, one-sided gypsum building boards type H2 : approx. 700 m2;

Single metal stud facing shells, cement building slabs on one side : approx. 150 m2;

wall coverings, gypsum building boards type H2 : approx. 310 m2;

UA-Ständerprofile : approx. 630 m;

Wooden trusses : approx. 120 pcs.;

Steel girders, F30 fire protection clothing type DF : approx. 23 m;

Ceiling insulation, HW multilayer board : approx. 40 m2;

Suspended ceilings with metal substructure, gypsum building board type H2 : approx. 1,040 m2;

Suspended ceilings with metal substructure, fibre cement construction board : approx. 14 m2;

Inspection flaps with GKB lid filling: approx. 81 pcs.;

Inspection flap systems, multi-part, with GKB lid fillings : approx. 7 pcs.;

Inspection door flaps, coated sheet steel: approx. 23 pcs.;

Wooden window sills, spruce : approx. 35 m;

Wooden window reveal cladding, spruce : approx. 220 m;

Fugendichtbänder BG R : ca. 240 m;

Silicone joints : approx. 240 m;

Preface:

Drywall work, accessibility and material handling

1) Material delivery and unloading:

The delivery of materials and unloading can be carried out via the materials used in the southern construction site,

between Nordendstraße and Arcisstraße, Marktgasse

Construction site development.

2) Drywall work on the 1st basement floor :

2.1) Access and transport of materials via stairwells :

The access and transport of all those specified in the bill of quantities

work, as well as all the equipment necessary for the execution, from the

Unloading point (Marktgasse) from the ground floor to the 1st basement floor is only accessible via

internal stairwells (market building 2 and market building 5) by hand transport

possible.

Treppengeometrie :

Double-flight, counter-rotating stairs with intermediate landings.

Running width, flights of stairs and landings: approx. 1.0 - 1.2 m

3) Drywall work on the ground floor :

3.1) Access and transport of materials to the respective market buildings 1 to 10 :

The access and transport of all those specified in the bill of quantities

work, as well as all the equipment necessary for the execution, from the

Unloading point (Marktgasse) to the respective market buildings 1 to 10 can only be reached by

Hand transport possible.

All of the aforementioned circumstances and circumstances are, as far as they are listed in the bill of quantities.

not shown separately, in the calculation of the respective unit prices to

and are not remunerated separately.

estimated execution dates : drywall works;

Start of expansion phase 1 : expected week 36 / 2023,

Duration : 4 weeks;

Start of expansion phase 2 : expected week 49 / 2023,

Duration : 17 weeks;

Elizabeth market: open procedure;

1) Construction project

1.1) construction of a new permanent market with 10 market buildings with a total of 22 sales units,

as a ground-floor (single-storey) building.

2) Gebäudenutzung

2.1) Building use market building, ground floor

Market buildings with stalls, as well as garbage rooms, storage rooms and sanitary facilities.

2.2) Use of the building, 1st basement

In the 1st basement (approx. 60% area of the construction site) are the sales stands

associated vehicle parking spaces of the dealers and storage rooms of the dealers, as well as sanitary facilities and

Technical rooms for the market stalls.

3) Information about the construction site

3.1) Location of the construction site

Elisabethplatz, 80796 Munich, parcel no. 4556/24, 4556/27, 4556/28

The construction project is located in Munich's Schwabing-West district.

The site borders the green space of Elisabethplatz to the north, Nordendstraße to the east,

south to the former property of Stadtwerke München (parcel number 4552) and to the west

to Arcisstraße.

West of the green area of Elisabethplatz is the Municipal Vocational School for Automotive Engineering

- Railway - Running operation.

The northern edge of the building site is bordered by a stock of trees that are worthy of protection.

The southern edge of the building plot is supported by the construction site for a new building of the

Stadtsparkasse München.

Due to the inner-city location, construction site conditions are limited.

In terms of space and time, the construction project is also close to the neighbouring construction project of the Stadtsparkasse

Munich. Due to the simultaneous construction,

and increased need for coordination.

3.2) Access to the construction site

The approach to the construction project and the material operation of the construction site is essentially carried out

via Nordendstraße. In a zone immediately north of the access road, the

Possibility of loading and unloading construction vehicles.

The access width to the construction site is approx. 6.00 m, the passage height is approx. 4.00 m

limited.

The access road is south by the construction site on the neighboring property

(Neubau Stadtsparkasse München). The completion of the southern adjacent

Construction site forms a façade scaffolding. This circumstance must be taken into account when entering the construction site.

to pay special attention.

3.3) Traffic conditions on the construction site

The inner development of the construction site from Nordendstraße via Marktgasse.

Here, in an approx. 5.50 m wide zone, there is the possibility of unloading and simultaneous

Passing construction site vehicles.

The exit for construction site vehicles is possible to the north via Arcisstraße.

For mobile cranes and large trucks, there is only the possibility to reverse over the Nordendstraße

drive out of the construction site. Securing the reversing exits into Nordendstraße

is to be organized by the corresponding company active in construction.

3.4) Traffic areas to be kept free

In the adjacent access road to the east of the building site (Nordendstraße)

Construction site facilities are only permitted in the designated areas.

The Marktgasse within the construction site must be kept free of any construction site equipment.

3.5) Transport equipment and routes

The construction project is accessed via the ground floor.

Within the construction project, vertical access will be carried out via the stairwells in the

Market buildings 2 and 5 (access buildings)

Construction lifts and hoists are not provided by the client.

3.6) Construction site, security and fencing

The construction site is supported by the construction logistics trade with construction fences and corresponding

Building fence gates demarcated and secured.

Existing construction fences are moved and supplemented as required.

3.7) Measures to protect trees and vegetation areas

Measures to protect the trees worthy of protection in the northern and western

Edge of the building plot are provided by the client.

If necessary, existing tree protection fences will be replaced by the construction logistics trade.

moved and supplemented.

3.8) Pollution of public transport areas

contamination of road space caused by the contractor by construction site vehicles,

Construction machinery and other equipment are caused by the contractor

to eliminate on one's own responsibility.

In particular, it is pointed out in this context that in the Nordendstraße

There are tram tracks which must be kept free of dirt or which, in the event of contamination,

must be cleaned again immediately.

3.9) Noise protection

The construction site is located in the immediate vicinity of the vocational school located on Elisabethplatz.

Users must therefore be taken into account during the entire construction project.

The relevant noise and emission control regulations must be observed, and in particular:

in the case of noisy work, to coordinate with the user regarding examination periods.

3.10) Obstacles in the construction site area

The crowns of the tree population worthy of protection on the northern and western edge of the

Building plots extend into the construction site area. In the area of the building crowns:

no machines are used.

The area under the trees, which is worthy of protection, is additionally protected by a fixed

Tree protection fence secured. No material may be stored in the protected area.

This must be done during the erection and assembly of the market buildings and the construction site equipment.

so that the trees are not damaged.

In the access area there are several shaft structures north of Marktgasse,

which are partially enclosed (opening of underfloor press containers).

These must be observed during the erection and assembly of the market buildings and must be observed before

Protect damage.

3.11) Cleaning of the construction site / access and disposal of construction rubble

The contractor must ensure a tidy, clean construction site.

The contractor has to clean up his entire work area on a weekly basis.

Debris, residual material, packaging materials and the like are at least

once a week to leave the construction site and dispose of it.

The workplaces must be cleaned daily and left broom clean.

4) Construction site equipment

4.1) Areas and rooms for construction site equipment

For construction site equipment, work and material storage areas, the customer shall

designated areas in Nordendstraße, Arcisstraße and Agnesstraße.

> see construction site set-up plan <

4.2) Areas for construction cranes

Required truck-mounted cranes are to be provided by the contractor on his own responsibility.

Installation sites of truck-mounted cranes (max. 30 t) are located in the area of the designated area in the

area of Marktgasse. Below the output points / column feet are

Load distribution plates with dimensions of at least 70x70 cm.

Public areas may only be swung over without load by the construction crane.

> see construction site set-up plan <

5) Bauversorgung

5.1) Baustromversorgung

The fees for applying for construction electricity as well as the consumption costs, up to the

The overall completion of the construction project is carried out by the client.

5.2) Bauwasserversorgung

The fees for the application for construction water as well as the consumption costs, up to the

The overall completion of the construction project is carried out by the client.

6) Construction process

6.1) Execution : Drywall work

Start of expansion phase 1 : expected week 36 / 2023

Duration : 4 weeks

Start of expansion phase 2 : expected week 49 / 2023

Duration : 17 weeks

6.2) Work of other contractors on the construction site

With the simultaneous execution of work by other contractors, during

of the entire construction period.

7) Building data

Building cot : +/- 0.00 m corresponds to 512.22 m above sea level2016

Bemessungswasserstand HW : 508,57 m üNHN2016 - 508,77 m üNHN2016

7.1) Building data market buildings 1, 3, 4, and 6 to 10

Gebäudemaße :

Market building 1 : length x beam : approx. 10.20 m x 13.00 m

Market building 3 : length x beam : approx. 12.50 m x 9.10 m

Market building 4 : length x width : approx. 9.05 m x 11.20 m

Market building 6 : length x beam : approx. 8.20 m x 14.60 m

Market building 7 : length x beam : approx. 14.00 m x 7.30 m

Market building 8 : length x width : approx. 13.25 m x 7.70 m

Market building 9 : length x width : approx. 11.40 m x 11.10 m

Market building 10 : length x width : approx. 14.80 m x 6.80 m

Gebäudehöhen :

Ceiling above ground floor: approx. 3.30 m above OK FFB ground floor

Eaves height: approx. 3.45 m above OK FFB ground floor

Ridge height: approx. 4.30 m - 4.60 m above OK FFB EG

7.2) Building data market buildings 2 and 5 (access buildings)

Gebäudemaße :

Market building 2 : length x width : approx. 14.50 m x 17.60 m

Market building 5 : length x width : approx. 13.50 m x 18.45 m

Gebäudehöhen :

Ceiling above ground floor: approx. 3.30 m above OK FFB ground floor

OK Attica : approx. 4.80 m - 4.90 m above OK FFB EG

7.3) Building data 1st basement

Floor heights :

1st basement : on average approx. 4.75 m - 5.00 m (ceiling above 2.UG and 1.UG on slope)

7.4) Building data for the new building of the Stadtsparkasse München

Building height: approx. 24.00 m - 25.00 m above ground level

8) Building construction (see specifications)

Download full details as .pdf
The Buyer:
Landeshauptstadt München, Kommunalreferat, Markthallen München
CPV Code(s):
44921100 - Gypsum
45000000 - Construction work
45223310 - Underground car park construction work
45261420 - Waterproofing work
45324000 - Plasterboard works
45400000 - Building completion work
45421146 - Installation of suspended ceilings
45451200 - Panelling work