Building dismantling Dismantling / disposal of the previous school building
Quantities:
Construction site equipment primary school Am Goldbach - 3 floor levels, floor area: approx. 750 m²,
- Gross floor area approx. 2,250 m²,
- Building height: approx. 10 m above sea level GOK,
- Converted space : approx. 6,500 m³
- approx. 2,500 tons of mineral demolition material (concrete / construction rubble)
Removal / disposal of components containing hazardous substances (excerpts):
- asbestos-containing roof waterproofing (flat roof approx. 720 m²)
- asbestos-containing fibre cement products (ventilation ducts + cladding panels approx. 20 m²)
- KMF-containing insulation (sloping ceilings, metal panels with KMF supports approx. 870 m², impact sound insulation approx. 730 m²)
- KMF-containing lightweight walls (approx. 400 m²)
- PCB-containing joint compounds indoors and outdoors (approx. 700 m)