The existing district heating network at Eigerplatz has a length of around 900m. As part of the extensions, around 1200m of additional routes are planned. In a similar context, the other gas, water and electrical lines will be renewed. From spring 2024, ewb's district heating network at Eigerplatz will be expanded. The construction and pipe construction work is expected to last until mid-2026.
The existing district heating network at Eigerplatz has a length of around 900m. As part of the extensions, around 1200m of additional routes are planned. In a similar context, the other gas, water and electrical lines will be renewed. From spring 2024, ewb's district heating network at Eigerplatz will be expanded. The construction and pipe construction work is expected to last until mid-2026.