The St. Gallen Theater is being expanded in volume in the north-west area and the flat roof is being raised in 2 areas. Subordinate areas (wood workshop, metal workshop and painting room) remain in operation during the construction work. The interior fittings will be completely renewed in some areas and only gently renovated in some areas.
BKP 273.6 Carpentry work Lot 2:
Supply and installation of interior doors made of wood, wall coverings, furniture fixed. Level B to level G (6 floors):
— Blind frame doors, 40 pcs.,
— glass doors fronts 2 pcs.
— wall cladding including substructure approx. 600 m
— cloakroom and cupboard fronts,
— Built-in workstations,
— kitchen and furniture fittings,
— Mirrors.
The St. Gallen Theater is being expanded in volume in the north-west area and the flat roof is being raised in 2 areas. Subordinate areas (wood workshop, metal workshop and painting room) remain in operation during the construction work. The interior fittings will be completely renewed in some areas and only gently renovated in some areas.
BKP 273.6 Carpentry work Lot 2:
Supply and installation of interior doors made of wood, wall coverings, furniture fixed. Level B to level G (6 floors):
— Blind frame doors, 40 pcs.,
— glass doors fronts 2 pcs.
— wall cladding including substructure approx. 600 m
— cloakroom and cupboard fronts,
— Built-in workstations,
— kitchen and furniture fittings,
— Mirrors.