New building integrative school project Schweich consist of school building, swimming pool, three-field sports hall,
BRI 66 696 m
GaLaBau:
— break off the pads approx. 1 230 m
— Plant-based base cover clear about 1 760 m
— loosening and reinstalling the forthcoming gravel 1.470 m
— ground works approx. 1,594 m
— asphalt works approx. 713 m
— concrete pavement approx. 5 947 m
— epoxy resin bonded natural stone paving, approximately 330 m
— Lawn panels including seeding approx. 1,415 m
— plastic surfaces for play and sports facilities approx. 1 092 m
— sandy areas approx. 332 m
— planting areas with shrub and perennials approximately 1 375 m
— lawn sowing approx. 4 584 m
— tree solitaire plantings approximately 94 pieces,
— fences approx. 450 m
— concrete angle supports approximately 318 m,
— concrete block and seating steps approx. 167 m;
— drainage strands approx. 415 m,
— drainage channels approx. 408 m,
— Div. Sports, play equipment and equipment (e.g. bicycle stands, benches, handrails).
Civil engineering:
— excavated soil approx. 1 050 m
— compacting sand approx. 210 m
— Assistance installation grease traps,
— foundations for 8 extinguishing water intake cabinets,
— basic cables — plastic pipes DN110 to DN 400 approx. 1 300 m,
— basic lines — approx. 550 pieces of fittings (bends, branches, reducers),
— 16 concrete shafts,
— 14 control bays,
— construction site equipment, participation in construction and planning discussions, transport and transport,
— retention, extension, site clearance, if necessary,
— Leak tests, documentation with camera experience.
New building integrative school project Schweich consist of school building, swimming pool, three-field sports hall,
BRI 66 696 m
GaLaBau:
— break off the pads approx. 1 230 m
— Plant-based base cover clear about 1 760 m
— loosen and reinstall the forthcoming gravel 1 470 m
— ground works approx. 1,594 m
— asphalt works approx. 713 m
— concrete pavement approx. 5 947 m
— epoxy resin bonded natural stone paving, approx. 330 m
— Grass panels including seeding approx. 1 415 m
— plastic surfaces for play and sports facilities approx. 1 092 m
— sandy areas about 332 m
— planting areas with shrub and perennials approximately 1 375 m
— lawn sowing approx. 4 584 m
— tree solitaire plantings approximately 94 pieces,
— fences approx. 450 m
— concrete angle support elements approx. 318 m,
— concrete block and seating steps approx. 167 m,
— drainage strands approx. 415 m,
— drainage channels approx. 408 m,
— Div. Sports, play equipment and equipment (e.g. bicycle stands, benches, handrails).
Civil engineering:
— excavated soil approx. 1050 m
— compacting sand approx. 210 m
— Assistance installation grease traps;
— foundations for 8 extinguishing water intake cabinets,
— basic pipelines — plastic pipes DN110 to DN 400 approx. 1300 m,
— basic lines — approx. 550 pieces of fittings (bends, branches, reducers),
— 16 concrete shafts,
— 14 control bays,
— construction site equipment, participation in construction and planning discussions, transport and transport,
— retention, extension, site clearance, if necessary,
— Leak tests, documentation with camera experience.