6-lane expansion of the A43, BA 3a, AK Herne - AS Recklinghausen-Herten; New construction of traffic signs (BAB km 32.360 - BAB km 34.175).
New construction of VZT; Foundation partly flat, partly on bored piles; Steel structure with shield:
3rd construction phase in the course of the 6-lane expansion of the A43;
2 dWiSta traffic sign bridges, each with 2 foundations;
3 traffic sign bridges with blue signs and 2 foundations each;
4 traffic sign brackets with blue signs and 1 foundation each.