Relocation of rainwater systems
Connection of the old railway siding to a new rainwater pipe
Relocation of the dirty water systems
Connection to the transfer shafts of SWG AG on Bahnhofstraße.
Construction site equipment Psch
Construction preparation, surveying, traffic control technology Psch
Water retention Psch
Installing / removing inlets 2
Track ballast take up 23.5 m
Take concrete slabs 117 m
Gravel-Schottertragschicht 69 m
Frost protection layer 110.2 m
Planum 459 m
Make asphalt base course 420 m
Produce asphalt surface course 420 m
Pick up pavement 649 m
Borde record 10 m
Make paving 249 m
Install shelves 10 m
Make paving trough 10 m
Secure lines 15 m
Create trench 1 370 m
Building excavations for manholes DN 600 11 pcs.
Building excavations for manholes DN 1 000 5 pcs.
Manholes DN 600 11 pcs.
Manholes DN 1 000 5 pcs.
Deliver and install the floor 865 m
Core drilling 33 pieces
Dispose of asphalt 45 m
Rohlagerung / tube zone 320 m
Plastic pipeline DN 250 82.55 m
Plastic pipe DN 300 95,10 m
Plastic pipeline DN 350 86.50 m
Plastic piping DN 150 301.35 m
Connecting pipes DN 150 542 m
Warning tape 722 m
Small work Psch.