Installation of:
•Connection work at district heating transfer station provided by the utility company
•Buffer storage system with domestic hot water generation, 1,000 litres, including accessories
•Pressure holding station with automatic replenishment, including accessories
•Heating distributor with fittings, heating pumps and accessories
•Heating cables made of black steel pipe, DN 15-80, approx. 100 m, incl. accessories
•Heating cables made of ferritic stainless steel DN 15-65, approx. 900 m, incl. accessories
•Underfloor heating with heating circuit distributors and accessories, approx. 2,200 sqm
•Commissioning, adjustment, etc. of the heating system
•Production of core holes, approx. 150 pieces
Installation of:
•Connection work at district heating transfer station provided by the utility company
•Buffer storage system with domestic hot water generation, 1,000 litres, including accessories
•Pressure holding station with automatic replenishment, including accessories
•Heating distributor with fittings, heating pumps and accessories
•Heating cables made of black steel pipe, DN 15-80, approx. 100 m, incl. accessories
•Heating cables made of ferritic stainless steel DN 15-65, approx. 900 m, incl. accessories
•Underfloor heating with heating circuit distributors and accessories, approx. 2,200 sqm
•Commissioning, adjustment, etc. of the heating system
•Production of core holes, approx. 150 pieces