B30 Schweinhausen/Hochdorf - Object planning of engineering structures according to § 41 ff HOAI 2021 in conjunction with Annex 12, LPH 1- 3 and 6 each partial services according to LB + Bes. Services as well as specialist planning Structural planning according to § 49 ff HOAI 2021 in conjunction with Annex 14, LPH 2, 3 and 6 (LPH 1 in OPI)
As part of the maintenance of the structure, replacement new buildings are to be planned for two bridge structures in the course of the B 30. The 9-span structure with a bridge area of 2933 m² near Schweinhausen carries the water I. order Riss and the highway L 284. The 5-span structure near Hochdorf with a bridge area of 2013 m³ carries the electrified railway line 4500 Ulm-Friedrichshafen.
The subject of the contract to be awarded is the building planning ready for tendering according to RAB-ING (object planning civil engineering structures and specialist planning structural planning). The demolition of the existing building and the new building must be planned. Optionally, the traffic routing during the construction phases (insertion/temporary bridge) must be planned. The aim of planning is economic planning with little impact on traffic and the environment. Within the framework of BIM, the planning is to be created as a 5D model.