Viktoriastift Clinic, Cecilienhöhe 3, 55543 Bad Kreuznach: Restructuring of house 10, complete renovation of the historic building (built in 1913) with partly Renewal of roof areas. Operation is discontinued during the construction phase.
Construction phase 1 construction line
Remove 350 m² of vegetation cover
Remove and store 115 m³ of topsoil
115 m³ frost protection layer
Construction phase 2 landscaping work
50 m wall panels, h= 55 cm to 155 cm
Pick up and install 115 m³ of frost protection layer
Deliver 55 m³ of frost protection layer
220 m² gravel lawn
25 m low curb
30 m² concrete paving
35 m edging plates for plastic flooring
70 m² plastic covering
20 wooden palisades
40 m rod mesh fence, H = 4.50 m
1 St swing gate
100 m² ball net, installation horizontally as a net roof
Apply 115 m³ of topsoil