Low-voltage systems including maintenance over 4 years
The existing 2-stream community school will be expanded into a 3-stream primary school for collaborative learning (inclusion). To this end, partial demolition, conversion and modernisation measures will be carried out in the remaining existing buildings, as well as the existing building structure will be supplemented by extensions and new buildings.
The order includes:
The installation of fire detection and alarm systems, an induction loop system, a wire system, search and signalling systems as well as stairwell SHEV systems.
In addition, the low-voltage network with cables and wires including laying material must be installed.
The maintenance contract for the fire detection and alarm system is also part of the award, but will be commissioned separately afterwards.