Contract Value:
-
Notice Type:
Contract Notice
Published Date:
04 July 2012
Closing Date:
15 August 2012
Location(s):
NL422 Midden-Limburg (NL Netherlands/NEDERLAND)
Description:
Biomass scale Up Buggenum.

The Willem Alexander Centrale (WAC) is a coal gasification power plant, located in the southern part of the Netherlands. The power plant has a capacity of approximately 240MWe, is commissioned in 1993.

To reduce CO2 emissions, the possibility of co-gasification of biomass in the WAC is being studied. The strategy of Nuon aims to co-gasify 70 % (energy basis) biomass at the WAC. In order to reach this goal, Hardware Modifications (HMs) to the existing facility are required.

The extension concerns two concrete silos and handling facilities. A combination of reusing existing installations and new equipment is required. For more general information on the facilities in Buggenum and NUON in general, we refer to www.nuon.com.

Download full details as .pdf
The Buyer:
NUON Power Buggenum B.V.
CPV Code(s):
44600000 - Tanks, reservoirs and containers; central-heating radiators and boilers
45220000 - Engineering works and construction works
45250000 - Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry