The subject of the contract is the execution of design and construction works of a complete photovoltaic installation with a capacity of kWp located at the headquarters of the Skrwilno 12.3 kWp Forest District equipped with an energy storage of at least 14 kWh, located at the forest nursery in Nowa Wieś Solec Kujawski Forest District
Execution of design and execution works of a complete photovoltaic installation with a capacity of 12.3 kWp equipped with an energy storage with a capacity of at least 14 kWh, located at the nursery in Nowa Wieś Solec Kujawski Forest District. Scope: • Execution of an electrical project containing diagrams, drawings necessary for the proper execution of electrical installation and automation system of PV panel installation. • Execution of designs of mounting structure for PV panels. • installation of a photovoltaic panel system with the supply of instrumentation and cabling. • Connection of the photovoltaic installation to the internal network of buildings and reconstruction of the energy measurement system adapting the system to the measurement of generated energy. • Configuration of surveillance system applications. • Performing appropriate tests and measurements and drawing up protocols.