repair work on communal and intercommunal roads in the department of Lozère
road 2023 phase 1 sector 03 Grandrieuserious bitumen: 655 T
Bituminous concrete: 410 T
Untreated Grave: 2,070 T
Bilayer coating: 6,000 M2
roads 2023 phase 1 sector 04 LangogneBituminous concrete: 496 T
Part-time jobs: 36 T
Cold asphalt: 1,271 M2
road 2023 phase 1 sector 05 Châteauneuf de RandonBituminous concrete: 290 T
Part-time jobs: 13 T
Serious untreated: 1,210 T
Cold asphalt: 140 T
road 2023 phase 1 sector 06 Monts de RandonBituminous concrete: 371 T
Untreated grave: 1,620 T
Disbursement: 500 m3
Bilayer coating: 3,130 M2
road 2023 phase 1 sector 12 Gorges and Caussessevere emulsion: 609 T
Bilayer coating: 8,722 M2
Cold asphalt: 1,400 M2
road 2023 phase 1 sector 13 Florac Trois Rivièresconcrete C35/45: 480 M2
Severe emulsion: 318 T
Bilayer coating: 5,190 M2
Masonry: 43.5 M3
road 2023 phase 1 sector 14 Pont de Montvert Sud Mont-Lozèresevere emulsion: 747.5 T
Bilayer coating: 10,450 M2
Bituminous concrete: 253 T
Masonry : 81 m3
road 2023 phase 1 sector 15 Saint Germain de Calbertesevere emulsion: 1,025.5 T
Coating: 16,815 m2
Masonry: 182.3 m3
Riprap: 243.5 m3
Gnt : 560 M3