Extension of the Gymnasium Höchstadt a. d. Aisch
4-storey new extension building with 20 classrooms, specialist rooms for physics as well as learning landscapes, ancillary and technical rooms.
Hybrid construction in reinforced concrete and wood.
Extension of the Gymnasium Höchstadt a. d. Aisch
1 St Wandlermessung/Hauptverteilung
5 St Stand-Unterverteilungen
Approximately 1400 EIB participants
Approx. 2000 m of installation systems (sewers, cable trays, pipes)
approx. 30 m Brandschutzverkleidung
Approx. 47000 m of power lines in general
Approx. 14000 m low-voltage power lines in general
Approx. 1600 pcs installation devices (switches, sockets, etc..)
Approx. 502 luminaires
Ca. 130 St. Sicherheitsleuchten/Rettungszeichenleuchten
6 St. Notlichtsysteme
5 St. Server/-Netzwerkschränke
Execution time
Start: 24.KW 2024
End: 31.KW 2025