Extended bodyshell.
excavation:
- 350 m
Sealing and insulation work:
- 1 900 m
- 1 650 m
- 2 450 m
- 3 000 m
- 500 m wu-sealing injection hose + joint plates,
- 130 m
Concrete and reinforced concrete works:
- 1 750 m
- 2,800 meters
- 1 650 m
- 460 external wall supports, StBt 0.25,
- 1 650 m
- 11 000 m
- 107 St. Innenstützen StBt.,
- 15 900 m
- 2 200 t rebar B500B, all diameters 8-28 mm,
- 75 St. StBt.-Fertigteile interior wall manholes,
- 100 pcs. StBt. Prefabricated interior wall aprons,
- 54 St. StBt flights of stairs,
- 11 pieces concrete construction for light wells StB prefabricated part.
TGA under construction:
- 310 m underground lines,
- 2 200 m
Assembly and inlay work for the manufacture of lightning protection and foundation earth electrodes as well as conveyor systems in shell construction.