Roofing work for the renovation of the secondary school in Cadolzburg
At the Cadolzburg secondary school, the roof windows in the break hall are being replaced as part of the energy-efficient renovation and upgrading of the fire protection system. The six roof windows will be removed and disposed of. Two SHEV roof windows and four fixed glazed roof windows will be installed. Due to the façade insulation in the roof area, plumbing work is necessary to cover the on-site insulation. The cover plate is to be passed under the existing drip plate and attached to a wooden strip.
Execution:
April bis June 2024