Contract Award
As a landlord RBKC is responsible for the repair, maintenance and good management of its buildings and housing stock RBKC is proposing to establish framework agreements for the provision of professional services that will enable it to meet these obligations.
From time-to-time work is required to RBKC’s buildings and estates, due to ordinary wear and tear, the finite lifespan of the relevant parts, for compliance with the most up to date standards and regulations, and to otherwise ensure that its housing stock is safe, well managed, in good condition, and meets the needs of residents. To facilitate this work, professional and specialist advice is required to support the internal delivery teams.
The proposed framework agreements are intended to ensure that when, during the coming years, RBKC finds that it is necessary to carry out works to a particular building or estate, arrangements will be in place to call-off and deliver the professional services that will support the safe, timely and cost-effective delivery of works.
RBKC intends that the use of these framework agreements will produce economies of scale and administrative efficiencies, that will enable it to achieve greater value for money for the Council, and for its leaseholders. To that end, RBKC has divided the procurement into multiple lots so as to mitigate risk, foster competition in the market by promoting tender participation from small and medium size enterprises, and avoid single-supplier dependency.
The framework agreement established under this lot will be used by RBKC to access and call-off a range of multi-disciplinary construction professional services, to support a variety of projects in Housing Management. Most of the services called off and delivered under the framework agreement for this lot will relate to major works programmes to RBKC housing stock. Works arising from the issue of a typical call-off package might include but are not limited to the following:
- planned or cyclical maintenance including repairs and decorations of external fabric and internal communal areas. The scopes might also include various works to M&E elements, as part of wider major works packages;
- Internal works to tenants homes e.g. Kitchen and bathrooms replacements; and
- upgrades to fabric and services to meet the RBKC Net Zero commitments are to form part of these works.
Suppliers appointed to this lot will usually be required to take the role of lead consultant managing overall service delivery, and other consultants as part of a wider project team.
Typical services delivered under this lot might include, but are not limited to:
Lead consultancy role
Project and Programme Management
Building surveying
Contract Administration/ Employers Agent
Quantity Surveying/Cost consultancy
Feasibility studies, options appraisals, site investigations, technical reports
Architectural and design services
Environmental and Sustainability consultancy
Building services (M&E) consultancy, including lifts
Civil and structural engineering
Principal Designer/CDM coordination
Landscaping design
Acoustic consultancy
Façade engineer
BIM consultancy (BIM Coordinator/Manager)
Building safety compliance (e.g. Asbestos, Fire Safety)
planned or cyclical maintenance including repairs and decorations of external fabric and internal communal areas. The scopes might also include various works to M&E elements, as part of wider major works packages
Internal works to tenants homes e.g. Kitchen and bathrooms replacements
upgrades to fabric and services to meet the RBKC Net Zero commitments are to form part of these works
This lot will usually take the role of lead consultant managing overall service delivery, and other consultants as part of a wider project team.
Typical services delivered under this lot might include but are not limited to:
Lead consultancy role
Project and Programme Management
Building surveying
Contract Administration/ Employers Agent
Quantity Surveying/Cost consultancy
Feasibility studies, options appraisals, site investigations, technical reports
Architectural and design services
Environmental and Sustainability consultancy
Building services (M&E) consultancy, including lifts
Civil and structural engineering
Principal Designer/CDM coordination
Landscaping design
Acoustic consultancy
Façade engineer
BIM consultancy (BIM Coordinator/Manager)
Building safety compliance (e.g. Asbestos, Fire Safety)
he framework agreement established under this lot will be used by RBKC to access and call-off services relating to the monitoring of works for compliance with approved drawings and specification, ensuring they are constructed in accordance with the relevant regulations and achieve agreed quality of works.
The services required under this lot include:
Monitoring and reporting progress against the programme.
Assessing whether the works on site comply with legal requirements such as health and safety legislation.
Assessing whether the works on site are being carried out in accordance with the contract documents.
Monitoring site conditions to ensure that work is undertaken in accordance with manufacturers recommendations.
Identifying defects and suggesting ways to correct them liaising with other construction staff, such as contractors, engineers and surveyors monitoring.
Providing sign-off for work and key stages during construction and handover.
two.2.5) Award criteriaII.2.5) Award criteria
Price is not
The framework agreement established under this lot will be used by RBKC to access and call-off services where specific advice, project management, guidance and technical services are required in relation to asbestos management of RBKC Housing property portfolio.
The services required under this lot include:
Asbestos Management surveys
Refurbishment and Demolition Surveys
Re-inspection Surveys based on the existing Management Survey.
Sample Analysis.
Air Monitoring and Clearance Testing.
Production of Asbestos Management Plans
General advice regarding asbestos e.g. Maintenance, management, removal strategies and methodologies.
The framework agreement established under this lot will be used by RBKC to access and call-off a range of services relating to Strategic Estate Management matters, including the use, management, acquisition, disposal and development of land and property in order to efficiently manage the stock and identify savings and opportunities to generate income from land and buildings.
The services required under this lot include:
Asset Valuation
Option Appraisals
Acquisitions
Disposals
The framework agreement established for this lot will be used by RBKC to access and call-off a range of Mechanical and Electrical Design Services on projects that typically involve:
- replacement or repair of any mechanical and electrical assets including but not limited to: heating systems, door entry systems, lifts, ventilation systems, gas and electrical supply and distribution, security and alarms, communications networks, pumps, tanks, fire detection and protection and lighting; and
- other works that must be completed on a regular basis e.g., servicing and testing requirements set out in law or maintenance terms where specialist input will be required.
The services required to be delivered under this lot will include
Technical advice
Specialist surveys
Feasibility studies
Specialist design
Technical specifications
Cost consultancy
Contract management
Project management
he framework agreement established under this lot will be used by RBKC to access and call-off services where any planned works may involve the expertise to investigate the structural elements to ensure structural integrity and building safety is maintained in line with current legislation.
Typical projects where the framework agreement under this lot may be required could include:
Structural remedial works e.g. adding wind posts to walkway parapets, remedial works following the subsidence and introduction of new movement joints to large areas of existing brickwork.
The services required to be delivered under this lot include:
Structural integrity tests, analysis, advice
Structural design and remedial specifications
Feasibility reports
Calculating the loads and stresses of the construction
Site surveys and investigations
Provide reasons for and solutions to cracking, other structural issues
Fire Safety - Consultancy / Fire Engineer
The framework agreement established under this lot will be used by RBKC to access and call-off specialist expertise in relation to the fire safety aspects of works to RBKC Housing property portfolio, to ensure the safety and regulatory compliance of the buildings.
The projects for which this framework agreement may be used might include design, specification development of the fire safety projects such as suppression systems fire alarms, detection systems, ventilation, means of escape, compartmentation strategies.
The services required to be delivered under this lot include:
FRAEW (PAS 9980)
Fire Compartmentation survey, Fire stopping inspections
Fire Strategy/Design development and review
Fire safety technical advice and guidance
Feasibility studies
Building safety case development/building safety act advice
The framework agreement established under this Lot will be used by RBKC to access and call-off the provision of competent and compliant fire risk assessments across RBKC’s property portfolio as per the RBKC Fire Risk Assessment (FRA) Process.
The services required under this lot include
FRAs Type 1, 2, 3 ,4
FRA reviews, auditing/appraisal
Methodology as detailed in PAS 79-2 for residential buildings, and PAS 79-1
The framework agreement established under this lot will used by RBKC to access and call-off services relating to regulatory fire door inspections requirements as outlined in regulation 10 of the Fire Safety (England) Regulations 2022
The services required under this lot include:
Undertaking annual checks of flat entrance doors
Quarterly checks of all communal fire doors
he framework agreement established under this lot will used by RBKC to access and call-off Waking Watch services that might be required as a protective measure for residential buildings to ensure the safety and welfare of residents. Typically, these services will be located in blocks where cladding or faulty fire alarm systems may be of concern and prior to its remediation.
The waking watch services will include:
Pro-activeness and vigilance to notice any changes which may compromise safety at their respective sites
Responsive presence to fire safety issues and hazards- continuous monitoring and control, and reporting to Client
Fire identification and alerting residents.
evacuation management
Fire service liaison
The framework agreement under this lot used by RBKC to access and call-off specialist services for retrofit projects where the PAS 2035 specification and guidance compliance is mandatory (e.g. SHDF Funding).
The services required under this lot include:
Retrofit Advisor
Retrofit Coordinator
Retrofit Assessor
Retrofit Evaluator
The framework agreement established under this lot will be used by RBKC to access and call-off services required by a Principal Designer as defined within the Construction (Design and Management) Regulations 2015. This lot has been included to ensure we can maintain a separation of duties throughout the life of a project.
The services required to be delivered under this lot include:
Collation of all existing health and safety information for the project, including but not limited to fire risk assessments, environmental impact assessments, asbestos surveys and registers, risk registers and health and safety file.
Assisting the client in developing the pre-construction information, for the project lead, lead designer, this may be in full or partial. Attending site and carrying out random health and safety inspections.
Reviewing health and safety documentation, ensuring it is site tailored and for use.