Machines and apparatus for testing and measuring | Tenderlake

Machines and apparatus for testing and measuring

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
30 July 2021
Closing Date:
01 September 2021
Location(s):
PL POLSKA (PL Poland/POLSKA)
Description:
Successive supply of consumable and chromatographic parts

The subject of the order is the delivery of consumable and chromatographic parts. The Contracting Authority shall allow the submission of partial tenders. A detailed description of the object of the order is included in the Annexes 1.1. to 1.36 to SWZ “Offer Form” (respectively for each part of the order).

In Annexes 1.1. to 1.36 to SWZ, sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria set by the Contracting Authority are indicated.

The order includes 36 separate parts (packages). The Contractor may bid for one or more parts (maximum 36).

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

Package No. 1

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the object of the order is set out in Annex 1.1. to the SWZ,

In Annex No 1.1. to SWZ, sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Ordering Party are indicated.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Delivery of individual lots should be carried out within 7 days from the date of placing the detailed order

Package No. 10

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex No 1.10. to the SWZ.

Annex No 1.10. to the SWZ indicate sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Ordering Party.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 11

The object of the order is the delivery of consumable and chromatographic parts. A detailed description of the item is set out in Annex No 1.11. to SWZ.

Annex No 1.11. to the SWZ specifies the sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 12

The object of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is described in Annex 1.12. to SWZ.

Annex No 1.12 to the SWZ identifies the sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 13

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the object of the order is indicated in Annex No 1.13 to the SWZ.

Annex No 1.13 to the SWZ indicate the sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Ordering Party.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 14

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex 1.14 to the SWZ.

Annex No 1.14 to the SWZ indicate sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Ordering Party.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 15

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the object of the order is contained in Annex No 1.15. to the SWZ.

Annex No 1.15 to the SWZ specifies the sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 16

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex 1.16 to the SWZ.

In Annex No 1.16 to SWZ, sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Ordering Party are indicated.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 17

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the object of the order is indicated in Annex No 1.17 to the SWZ.

In Annex No 1.17 to SWZ, sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Ordering Party are indicated.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 18

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is indicated in Annex No 1.18 to the SWZ.

Annex No 1.18 to SWZ identifies sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria laid down by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 19

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is indicated in Annex No 1.19 to the SWZ.

Annex No 1.19 to the SWZ indicate sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Ordering Party.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 2

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex 1.2. to the SWZ.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 20

The object of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex 1.20 to the SWZ.

Annex No 1.20 to the SWZ specifies the sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria set out by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 21

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex No 1.21 to SWZ Tender Form.

In Annex No 1.21 to SWZ, sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Contracting Authority are indicated.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 22

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the order is set out in Annex No 1.22 to the SWZ.

In Annex No 1.22 to SWZ, sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria laid down by the Ordering Party are indicated.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 23

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex No 1.23 to the SWZ.

Annex No 1.23 to the SWZ indicate sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Ordering Party.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 24

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the object of the order is contained in Annex 24 to the SWZ.

Annex 24 to the SWZ identifies the sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Ordering Party.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 25

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex No 1.25 to the SWZ.

Annex No 1.25 to the SWZ indicate sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria set by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 26

The subject of the order is the supply of consumed and chromatographic parts. A detailed description of the item of the order is set out in Annex 1.26 to the SWZ.

In Annex No 1.26 to SWZ, sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Contracting Authority are indicated.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 27

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex 1.27 to the SWZ.

Annex No 1.27 to the SWZ identifies the sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria laid down by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 28

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex No 1.28 to the SWZ.

In Annex No 1.28 to SWZ, sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Contracting Authority are indicated.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 29

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex 1.29 to the SWZ.

In Annex No 1.29 to SWZ, sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Contracting Authority are indicated.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 3

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex 1.3. to the SWZ.

Annex No 1.3. to the SWZ indicate sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria set out by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 30

The subject of the order is the delivery of consumable and chromatographic parts A detailed description of the object of the order is included in Annex No 1.30 to SWZ.

In Annex No 1.30 to SWZ, sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Ordering Party are indicated.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 31

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex 1.31 to the SWZ.

Annex No 1.31 to SWZ specifies the sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned. Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Delivery of individual lots should be carried out within 7 days from the date of placing the detailed order

Package No. 32

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex 1.32 to the SWZ.

Annex No 1.32 to the SWZ indicate sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria set out by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 33

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex No 1.33 to the SWZ.

Annex No 1.33 to the SWZ indicate sample catalogue numbers and the example manufacturers of consumable and chromatographic parts that meet the criteria set out by the Ordering Party.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 34

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is included in Annex No 1.34 to the SWZ.

Annex 1.34 to SWZ indicated sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria set by the Ordering Party.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 35

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex 1.35 to the SWZ.

Annex No 1.35 to the SWZ identifies the sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria set out by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 36

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex 1.36 to the SWZ.

Annex No 1.36 to the SWZ identifies sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria set out by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 4

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is included in Annex No 1.4. to SWZ Offer Form.

Annex No 1.4. to the SWZ indicate sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria set by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package number 5

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the object of the order is contained in Annex No 1.5. to the SWZ.

Annex No 1.5. to the SWZ indicate the sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria set by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Delivery of individual lots should be carried out within 7 days from the date of placing the detailed order

Package number 6

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex No 1.6. to the SWZ.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 7

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the object of the order is indicated in Annex 1.7. to the SWZ.

Annex No 1.7 to the SWZ indicate sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria set out by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 8

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the pre-mitou order is indicated in Annex No 1.8. to SWZ.

Annex No 1.8. to the SWZ indicate the sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria set out by the Contracting Authority.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Deliveries of individual lots should be made within 7 days from the date of placing the detailed order.

Package No. 9

The subject of the order is the delivery of consumable and chromatographic parts. A detailed description of the item of the order is set out in Annex No 1.9 to the SWZ.

Annex No 1.9. to the SWZ specifies the sample catalogue numbers and the example manufacturers of consumable and chromatographic parts meeting the criteria set out by the Ordering Party.

The Contractor shall be obliged to submit an offer covering all items in the package concerned.

Factory new materials, free of physical defects, from current production, and legally required certificates and marketing certificates in the EU are required.

The Contracting Authority shall require the provision of consumable and chromatographic parts in original packaging and labelled in accordance with applicable law. There should be a catalogue number on the packaging.

It is envisaged to complete the order in batches, based on detailed order- placed by e-mail or using the platform, if used by the Contractor - by authorized employees of the Ordering Party.

Delivery of individual lots should be carried out within 7 days from the date of placing the detailed order

Download full details as .pdf
The Buyer:
Instytut Ogrodnictwa w Skierniewicach
CPV Code(s):
38000000 - Laboratory, optical and precision equipments (excl. glasses)
38300000 - Measuring instruments
38410000 - Metering instruments
38432200 - Chromatographs
38437000 - Laboratory pipettes and accessories
38540000 - Machines and apparatus for testing and measuring