New construction of the town hall Altusried with underground parking and 3 full floors. Building heating is provided by local district heating, distribution in buildings is realized over approx. 1300 m² of underfloor heating. For building temperature control, there is a heat pump with direct condensation with 3 condensation accumulators in the underground car park technical room. In addition, fan convectors are used in the attic for cooling.
New construction of the town hall Altusried with underground parking and 3 full floors. Building heating is provided by local district heating, distribution in buildings is realized over approx. 1300 m² of underfloor heating. For building temperature control, there is a heat pump with direct condensation with 3 condensation accumulators in the underground car park technical room. In addition, fan convectors are used in the attic for cooling.