Wave Hub are planning the installation of 4 no. 33kV rated cable tail extensions from the current dry mate connectors to 4 developer berths offshore Hayle, Cornwall. This scope details the Installation requirements to replace the current 11kV rated dry mate connectors with 33kV rated in-line joints, install 4 new lengths of cable tails and to terminate the extension cables with 1/2 of a 33kV dry mate connector.
Services required for the installation of 4 no. 33kV rated cable tail extensions from the current dry mate connectors to 4 developer berths offshore Hayle, Cornwall. To include replacement of current 11kV rated dry mate connectors with 33kV rated in-line joints, installation 4 new lengths of cable tails and termination of the extension cables with 1/2 of a 33kV dry mate connector.