U1275-13 Construction of a storm basin (400m3) and a storm basin with pumping station (90m3) in Boxhorn and construction of a collector from Boxhorn to the Sassel wastewater treatment plant. Civil engineering works (lot 1) and electromechanical equipment (lot 2)
Lot 1: Civil EngineeringCivil engineering work
Lot 2: Electromechanical equipmentElectromechanical equipment work