Federal Ministry of the Interior, Construction and Home
Extension building Moabiter Werder (EMW)
Metal work doors DIN 18 360 - KKE 317-01
From the basement to the attic, a total of 66 sheet steel doors with steel frame frames will be galvanised, primed and powder-coated on 13 floors.
On the ground floor, sheet steel doors are powder-coated with steel frames (block and enclosing frames) and two tubular frame doors.
Period:
Start: June 2022
End: May 2024
Binding individual deadlines