AND 316.1 Rohrrahmentüren
The metal construction and glazing work for the practical part of the vocational school Höchstädt (in 2
Construction phases) consist mainly of tubular frame doors with fire protection /
Smoke protection requirements in corridors and stairwells, as well as individual
Room closures. In the BA1b, sheet steel doors and
F30 fixed glazing.
The practical part (building height approx. 13.50 m) in BA 1a consists of a 3-storey
Building with workshops and classrooms, plus a single-storey building in BA 1b
Part of the building with 2 adjoining greenhouses, the doors and windows to the
Greenhouses must be designed as insulated elements.
BSHÖ_Rohrrahmentüren_Massen for publication as of 01.12.2022
BSHÖ_ tubular frame doors work: publication details
AND 316.1 Rohrrahmentüren
Short description:
The metal construction and glazing work for the practical part of the vocational school Höchstädt (in 2
Construction phases) consist mainly of tubular frame doors with fire protection /
Smoke protection requirements in corridors and stairwells, as well as individual
Room closures. In the BA1b, sheet steel doors and
F30 fixed glazing.
The practical part (building height approx. 13.50 m) in BA 1a consists of a 3-storey
Building with workshops and classrooms, plus a single-storey building in BA 1b
Part of the building with 2 adjoining greenhouses, the doors and windows to the
Greenhouses must be designed as insulated elements.
masses:
- 120 m² (17 pieces) tubular frame doors with fire/smoke protection function (T30RS/RS)
- 2 pieces of sheet steel doors T30RS, insulated
- 6m² (2 pieces) fixed glazing F30 insulated
CPV codes:
44221220-3 Fire doors
45262670-8 metal construction work
45441000 Verglasungsarbeiten
Events:
BA 1a: 2nd quarter 2023 – 1st quarter 2024 (approx. week 26/'23 planning, until week 09/'24 assembly)
BA1b: Q2 2025