New construction of a sports hall at the Berufskolleg Bocholt West
Electrical installation
1 piece of meter main distribution
4 sub-distributions
6400 m cables up to 5 x 4 mm²
650 m cables up to 5 x 35 mm²
380 m Kabelrinnen
70 presence detectors
56 pieces of sports hall light
5 pcs pole lights
160 recessed and recessed luminaires
1 pc photovoltaic system 29 kWpeak
2 game score indicators
1 emergency lighting system with 95 luminaires