CSC 57/52/5/21/047 Development of Luttre station Renewal of the sealing screed of the under-track corridor of Luttre Station North Phase

Track works

Thus, with regard to track works, it includes, in particular:

- Support for INFRABEL's renewal trains;

- The removal of rails, tracks;

- Earthworks;

- The laying of the foundation of tracks;

- The laying of rails, tracks;

- The realization of aluminothermic welds;

- Stress adjustment;

- Jamming, levelling & dressing of tracks and switches and crossings

- The removal and installation of cable gutters

- Logistical services;

- Transport & evacuation of debris and various materials;

- Adaptation of the route of the tracks;

- The removal and installation of signalling equipment;

- Excavation work;

- Concreting work (with supplies);

- Removal and installation of quay edges;

- Removal and installation of dock cladding;

- Various works;

Catenary work

Thus, with regard to catenary work, it includes, in particular:

- Preliminary studies, precise measurement and preparation of the work;

- Any administrative procedures;

- The realization of massifs (armor, excavations, concreting, ...);

- Assembly work on metal equipment;

- The supply of metal equipment and other materials necessary for the work

- Work to rip the catenary;

- Work on contact line, isolators or connections;

- Personnel and logistics services;

- Various works;

signaling work

Thus, as far as signalling is concerned, the work to be carried out relates to the external signalling and level crossing installations that Infrabel uses in a unified manner throughout the network. These are:

- signalling devices on the outside;

- 1 000 V cabinets or compartments (low voltage connection only);

- railway light signals with their cabinets or boxes;

- switchgear manoeuvres;

- distribution boxes and cabinets;

- crocodiles;

- rail contacts, axle detectors;

- complete track circuits (including rail drilling);

- the various road signs;

- a network of multi-conductor outdoor cables linking devices located in the countryside to relay rooms, cabinets and boxes;

- the installation, removal, removal or restoration of gutters and their lids;

- the laying, removal or movement of gutter or buried cables;

- the supply, installation or construction of various elements (PVC / PE pipes, cable covers, draft chambers, concrete slabs for the placement of boxes);

- the installation of cabinets, boxes or boxes, including the introduction of cables and the necessary paints;

- a fibre-optic network for the command and control of signalling installations;

- the reordering of installations and the removal of obsolete materials;

- the handling necessary for the execution of this undertaking;

- the supply and installation of various accessories (bolting and screws in stainless steel exclusively, various metal parts in hot-dip galvanized steel);

- a network of monopolar HV cables (20 kV) and LV cables (1 kV) supplying the signalling installations.

- the handling necessary for the execution of this undertaking, including the installation and withdrawal of the site;

Civil engineering work

- The renewal of the sealing screed of the under-track corridor of Luttre station;

- Various maintenance works of the corridor-sub-track of the station of Luttre.

Track works

Thus, with regard to track works, it includes, in particular:

- Support for INFRABEL's renewal trains;

- The removal of rails, tracks;

- Earthworks;

- The laying of the foundation of tracks;

- The laying of rails, tracks;

- The realization of aluminothermic welds;

- Stress adjustment;

- Jamming, levelling & dressing of tracks and switches and crossings

- The removal and installation of cable gutters

- Logistical services;

- Transport & evacuation of debris and various materials;

- Adaptation of the route of the tracks;

- The removal and installation of signalling equipment;

- Excavation work;

- Concreting work (with supplies);

- Removal and installation of quay edges;

- Removal and installation of dock cladding;

- Various works;

Catenary work

Thus, with regard to catenary work, it includes, in particular:

- Preliminary studies, precise measurement and preparation of the work;

- Any administrative procedures;

- The realization of massifs (armor, excavations, concreting, ...);

- Assembly work on metal equipment;

- The supply of metal equipment and other materials necessary for the work

- Work to rip the catenary;

- Work on contact line, isolators or connections;

- Personnel and logistics services;

- Various works;

signaling work

Thus, as far as signalling is concerned, the work to be carried out relates to the external signalling and level crossing installations that Infrabel uses in a unified manner throughout the network. These are:

- signalling devices on the outside;

- 1 000 V cabinets or compartments (low voltage connection only);

- railway light signals with their cabinets or boxes;

- switchgear manoeuvres;

- distribution boxes and cabinets;

- crocodiles;

- rail contacts, axle detectors;

- complete track circuits (including rail drilling);

- the various road signs;

- a network of multi-conductor outdoor cables linking devices located in the countryside to relay rooms, cabinets and boxes;

- the installation, removal, removal or restoration of gutters and their lids;

- the laying, removal or movement of gutter or buried cables;

- the supply, installation or construction of various elements (PVC / PE pipes, cable covers, draft chambers, concrete slabs for the placement of boxes);

- the installation of cabinets, boxes or boxes, including the introduction of cables and the necessary paints;

- a fibre-optic network for the command and control of signalling installations;

- the reordering of installations and the removal of obsolete materials;

- the handling necessary for the execution of this undertaking;

- the supply and installation of various accessories (bolting and screws in stainless steel exclusively, various metal parts in hot-dip galvanized steel);

- a network of monopolar HV cables (20 kV) and LV cables (1 kV) supplying the signalling installations.

- the handling necessary for the execution of this undertaking, including the installation and withdrawal of the site;

Civil engineering work

- The renewal of the sealing screed of the under-track corridor of Luttre station;

- Various maintenance works of the corridor-sub-track of the station of Luttre.

Download full details as .pdf
The Buyer:
Infrabel - Area South-West
CPV Code(s):
45234116 - Track construction works