The installation of at least 27 electric vehicle (EV) charge points (of which 10 will be bi-directional V2G chargers and 17 will be ‘smart’ chargers), up to 10 solar canopies with a minimum 40 kW of photovoltaics (PV) across the Isles of Scilly. The installation works must be completed by the end of March 2021 with a five year maintenance contract thereafter.
The installation of at least 27 electric vehicle (EV) charge points (of which 10 will be bi-directional V2G chargers and 17 will be ‘smart’ chargers), up to 10 solar canopies with a minimum 40 kW of photovoltaics (PV) across the Isles of Scilly. The installation works must be completed by the end of March 2021 with a five year maintenance contract thereafter.