This consultation concerns lot 1 "Wet networks - dry networks - lighting". But the operation is divided into several batches. Lots 2 - 3 and 4 will be the subject of further consultations in 2021 - 2022 and 2023.
This consultation concerns lot 1 "Wet networks - dry networks - lighting". But the operation is divided into several batches. Lots 2 - 3 and 4 will be the subject of further consultations in 2021 - 2022 and 2023.