Part of the present procedure are the building construction work (3.) with the following services (content for each stage 2b + 3b):
- 2b: Transformer foundations and foundation grounding 1e stage
-2b: New building / extension apparatus house incl. plumber / roof builder and if necessary painting work (floor) without façade
-2b: Rohrblock – Stage 2
-2b: MAKS (oil separator), sewers
-2b: Water reservoir and water pipes (incl. plumber)
-2b: Schienenanlage 1st Stage
-3b: Lärmschutztragwand
-3b: Surfaces, environment, rail system 2nd stage
-3b: Transformer foundations and foundation grounding 2nd stage
-Grounding system (with certified sub-UN)
Part of the present procedure are the building construction work (3.) with the following services (content for each stage 2b + 3b):
- 2b: Transformer foundations and foundation grounding 1e stage
-2b: New building / extension apparatus house incl. plumber / roof builder and if necessary painting work (floor) without façade
-2b: Rohrblock – Stage 2
-2b: MAKS (oil separator), sewers
-2b: Water reservoir and water pipes (incl. plumber)
-2b: Schienenanlage 1st Stage
-3b: Lärmschutztragwand
-3b: Surfaces, environment, rail system 2nd stage
-3b: Transformer foundations and foundation grounding 2nd stage
-Grounding system (with certified sub-UN)