The consultation is launched according to a competitive procedure with negotiation carried out under the order n ° 2015-899 of the 23.7.2015 carried out in accordance with the provisions of articles 25-II-3 and 71 and 73 of the decree nº 2016-360 of 25.3. .2016. This qualified consultation of restricted will take place in 2 phases, a 1
This consultation concerns the completion of a project management mission dealing with the asbestos removal and demolition of a pavilion and the construction of approximately 23 dwellings at Pontault-Combault. The mission entrusted to the project manager is a mission of architecture in building - new works within the meaning of the MOP law n ° 85-704 of the 12.7.1985 modified, the elements of missions are detailed hereafter:
- Sketch (ESQ),
- preliminary draft (APS),
- Final draft (APD),
- Project (PRO),
- Assistance with the conclusion of the works contract (ACT),
- Visa of execution studies (VISA),
- Directorate of Works Execution (DET),
- Assistance in receiving operations and during the guarantee of perfect completion (AOR).