Electricity, heating, solar and nuclear energy | Tenderlake

Electricity, heating, solar and nuclear energy

Contract Value:
EUR 408K - 408K
Notice Type:
Contract Notice
Published Date:
09 July 2021
Closing Date:
26 August 2021
Location(s):
PL POLSKA (PL Poland/POLSKA)
PL619 Włocławski (PL Poland/POLSKA)
Description:
Lipnovska Buying Group. Electricity supply between 1.1.2022 and 31.12.2022

The subject of the order is the supply of electricity between 1.1.2022 and 31.12.2022 and 398 points of consumption (PPE) with a total estimated volume (± 10%) of 4,511.75 MWh, of which:

1) for premises and facilities (part 1 of the order) — 3,357,38 MWh — the detailed list of PPE is Annex 1a to SWZ;

2) for road lighting (part 2 of the order) — 1,154,37 MWh, the detailed list of PPE is Annex 1b to SWZ.

Supply of electricity to premises and facilities

1. Number of measurement systems accounting for electricity consumed 198 pcs.

2. A detailed description of the pre-emptive points (PPE) of the Contracting Party included in Annex No 1a to the SWZ.

3. Estimated electricity consumption over the term of the contract 3,357.38 MWh, of which:

— Zone I: 1 557,64 MWh,

— Zone II: 1,584,64 MWh,

— Zone III: 215.10 MWh.

The above data is indicative. The Contractor shall take into account possible fluctuations in electricity consumption at a level of ± 10%.

4. Delivery will take place between 1.1.2022 and 31.12.2022.

5. Current electricity supply contracts will expire or terminate with effect from the day preceding the planned delivery start date (column 'Delivery period'). The obligation to terminate the contracts lies with the contracting authorities (recipients).

Supply of electricity for the needs of road lighting

1. Quantity of measurement systems accounting for consumed electricity 200 pcs

2. A detailed description of the pre-emptive points (PPE) of the Contracting Party included in Annex No 1b to the SWZ.

3. Estimated electricity consumption over the term of the contract of 1,154.37 MWh, of which:

— zone I: 332,40 MWh,

— Zone II: 821.97 MWh.

The above data is indicative. The Contractor shall take into account possible fluctuations in electricity consumption at a level of ± 10%.

4. Delivery will take place between 1.1.2022 and 31.12.2022.

5. Current electricity supply contracts will expire or terminate with effect from the day preceding the planned delivery start date (column 'Delivery period'). The obligation to terminate the contracts lies with the contracting authorities (recipients).

Download full details as .pdf
The Buyer:
Gmina Wielgie
CPV Code(s):
09300000 - Electricity, heating, solar and nuclear energy
09310000 - Electricity