See II.2.4 - Description of the procurement.
1. Information on the construction project
- General description:
The property of the Federal President's Office, with the Bellevue Palace built in 1786, the administration building with the main guard erected in 1998 and the listed parks restored in 2001, also known as the Federal President's Triangle, is to undergo fundamental renovation and upgrading. The administration building is subject to copyright protection by the architect Gruber-Kleine-Kraneburg.
The BBR is looking for a suitable kitchen planning office with a focus on commercial kitchen planning for the provision of planning services for technical equipment in accordance with §§ 53 ff. HOAI, system group 7 - use-specific and procedural systems, cost group 471.
The estimated eligible costs for cost group 471 are approx. EUR 1 million net.
The aim is to adapt the properties of the property to today's requirements and to convert them into a holistic, modern and energetically sustainable overall concept.
The overall construction project is divided into 4 sub-construction projects with the following estimated costs:
- Sub-construction measure A: administration building (complete renovation and expansion)
Cost group 471: approx. EUR 280,000 net;
- Sub-construction measure B: guard and control building (demolition and new construction)
Cost group 471: approx. EUR 100,000 net;
- Partial construction measure C: Bellevue Palace (architectural monument) (complete renovation and redesign
Cost group 471: approx. EUR 350,000 net;
- Sub-construction measure D: outdoor facilities (garden monument) (technical renovation and upgrading)
Cost group 471: approx. … EUR net;
Measures required include: functional and Technical optimization of the castle kitchen for events up to 250 people.
- users:
Federal President's Office, represented by the Federal Office for Building and Regional Planning.
- Building use:
Administration building representation, administration, public events
In addition to representative and official appointments such as state visits, New Year's receptions, inaugural visits by ambassadors, the castle is also open to citizens. R. numerous events open.
- Type of construction:
Complete renovation in line with monuments and functional redesign of Bellevue Palace as well as implementation of the requirements planning; here functional u. technical optimization of the castle kitchen
- Project costs (net) for KG 200-600 acc. DIN 276:
Approx. Gross EUR 125 700 000 of which approx. EUR 1 million gross for KGR 471;
- Project duration:
IV quarter 2020 - late 2028
2. Subject of the order
- Performance range:
Planning services of the technical equipment according to §§ 53 ff. HOAI, plant group 7 - usage-specific and process engineering plants, cost group 471 kitchen planning, acc. Section 55 HOAI Annex 15.2 Commercial kitchens as production kitchens;
- Service profile:
The scope of planning services for kitchen systems LPH 1 - 9 as well as special services (step contract)
- Start / end of service provision:
IV quarter 2020 - late 2028
A gradual award of the services is planned. However, there is no legal claim to the transfer of all services.