Project description: Extension and extension of a laboratory building for the pre-clinic of the dental faculty of the University Hospital Tübingen including large rooms for phantom room and technical center. Extension in steel skeleton construction with wall elements made of aerated concrete, extension in solid construction made of reinforced concrete, both parts of the building with flat roof construction.
50m2 interior insulation plastered from mineral foam panels
375m2 interior insulation plastered with masonry of aerated concrete