Mother-Child-Center Auf der Bult, Hanover - plastering and stucco work
approx. 5000 m² Abklebearbeiten
approx. 860 m² walls concrete primer, working height: up to 3.50 m
approx. 1520 m² ceilings concrete primer, working height: up to 3.50 m
approx. 2110 m² edge profiles galvanized, for filler work, working height: up to 3.50 m
approx. 2585 m² separating strips for connection joints, working height: up to 3.50 m
approx. 1270 m² Q3 filling, concrete walls SB3, working height up to 3.50 m
approx. 171 m² interior plaster: masonry wall; 1-layer; CS II; Q2; d = 10 mm; h = up to 3.50 m
approx. 1000 m filler joints, area: wall - ceiling, working height: approx. 3.50 m
approx. 1550 m² of adhesive reinforcement filler under STB / HFT ceilings
approx. 1550 m² levelling plaster on ceiling 5 mm extra thickness
approx. 1530 m² Q3 filling ceiling, working height: up to 3.50 m