The object of the contract is the works of hydraulic infrastructure and/or waste treatment in the municipalities of Pedro Martínez (Granada) and Seville and Isla Mayor (Seville), in accordance with the construction projects already drafted
WORK OF COLLECTORS AND WWTP BY PEDRO MARTÍNEZ (GRANADA)The object of the contract is the execution of the pool of wastewater discharges in the municipality of Pedro Martínez, as well as the treatment plant where they will be treated for subsequent discharge into the receiving medium, in accordance with the already drafted project PEDRO MARTÍNEZ COLLECTORS AND WWTP (GRANADA), A5.318.102111
WORK ON THE ADAPTATION OF THE TREATMENT OF THE SEVILLE WASTEWATER TREATMENT FOR THE DISCHARGE TO A SENSITIVE AREA IN THE SURROUNDINGS OF DOÑANA. PHASE III. OPTIMIZATION OF THE SANITATION NETWORK OF THE WEST BASIN OF SEVILLEThe object of the contract is the execution of a transfer emissary that transports the wastewater from the west basin of Seville from the Tablada WWTP, after a pretreatment, to a point of the “Port Emissary”, which connects with the WWTP Copero, where it will be treated jointly with those in the northern basin, for subsequent discharge into the medium recipient complying with current legislation, in accordance with the draft already drafted ADAPTATION OF THE TREATMENT OF THE SEVILLE WWTP FOR DISCHARGE TO SENSITIVE ZONE IN THE DOÑANA ENVIRONMENT. PHASE III. OPTIMIZATION OF THE SANITATION NETWORK OF THE WEST BASIN OF SEVILLE, A5.341.2024/2111
WORK OF THE GROUP OF SPILLS OF ISLA MAYOR (SEVILLE)The object of the contract is the execution of the pool of wastewater discharges from the municipality of Isla Mayor to transport them to a new WWTP (not the subject of this action) where they will be treated for subsequent discharge into the receiving environment, in accordance with the legislation in force, in accordance with the project already drafted AGRUPACIÓN DE DISCHARGES DE ISLA MAYOR (SEVILLE), A5.341.2029/2111.