Civil engineering and road works — sewerage works
— road works (construction road),
— application of rain retention basins,
— Laiming noise barrier.
Sewerage:
— loosen approx. 21 950 m
— improve and install approx. 9 650 m
— loosen, load and dispose of approx.
— supply and install approx. 2 150 m of plastic pipes DN 200,
— supply and install approx. 850 m of plastic pipes DN 250,
— supply and install approx. 700 m of concrete pipes DN 300,
— supply and install approx. 770 m of DN 400 concrete pipes,
— supply and install approx. 530 m of DN 500 concrete pipes,
— supply and install approx. 240 m of concrete pipes DN 600,
— supply and install approx. 50 m of concrete pipes DN 700,
— supply and install approx. 60 m of concrete pipes DN 800,
— supply and install approx. 670 m of DN 900 concrete pipes,
— supply and install approx. 320 m of concrete pipes DN 1000,
— supply and install approx. 500 m of concrete pipes DN 1200,
— supply and install approx. 75 m reinforced concrete supply pipes DN 1200,
— supply and install approx. 2 860 m house connection cables DN/OD 160,
— approx. 110 pcs. supply and install concrete shafts for the GL channel,
— approx. 95 pcs Supply and install concrete shafts for SW channel.
Road works (construction road):
— loosen, load and process approx. 11 000 m
— loosen and laterally store approx. 4 000 m
— approx. 8 250 m
— produce approximately 41 200 m
— supply and install approx. 4 590 m of planned drainage,
— supply and install about 40 000 tonnes of natural stone crushed stone,
— supply and install approx. 4 400 t AC 22 T N base layer,
— deliver and set approximately 310 road flows,
— produce approx. 5 850 m of ballast banquets,
— supply and route approx. 1 050 m connecting cables DN/OD 160,
— Supply and install approx. 5 150 m
Laying for rain retention basins:
— loosen, load and process approx. 2 850 m
— loosen approx. 12 150 m
— approx. 8 150 m
- approx. 650 m
— supply and install approx. 1 throttle structure,
— supply and install approx. 850 tonnes of natural stone crushed stone,
— Supply and install approx. 1 100 m
Arrangance insulation wall:
— loosen, load and process about 400 m3 of topsoil,
— approx. 2 400 m
— Improve and install approximately 8 200 m