Underground work other than tunnels, shafts and subways | Tenderlake

Underground work other than tunnels, shafts and subways

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
14 May 2021
Closing Date:
09 June 2021
Location(s):
DEA35 Coesfeld (DE Germany/DEUTSCHLAND)
Description:
Development of the new development area “Huxburg” in Senden

Civil engineering and road works — sewerage works

— road works (construction road),

— application of rain retention basins,

— Laiming noise barrier.

Sewerage:

— loosen approx. 21 950 m3 soil,

— improve and install approx. 9 650 m3 of soil excavation,

— loosen, load and dispose of approx.3 950 m 3 floor,

— supply and install approx. 2 150 m of plastic pipes DN 200,

— supply and install approx. 850 m of plastic pipes DN 250,

— supply and install approx. 700 m of concrete pipes DN 300,

— supply and install approx. 770 m of DN 400 concrete pipes,

— supply and install approx. 530 m of DN 500 concrete pipes,

— supply and install approx. 240 m of concrete pipes DN 600,

— supply and install approx. 50 m of concrete pipes DN 700,

— supply and install approx. 60 m of concrete pipes DN 800,

— supply and install approx. 670 m of DN 900 concrete pipes,

— supply and install approx. 320 m of concrete pipes DN 1000,

— supply and install approx. 500 m of concrete pipes DN 1200,

— supply and install approx. 75 m reinforced concrete supply pipes DN 1200,

— supply and install approx. 2 860 m house connection cables DN/OD 160,

— approx. 110 pcs. supply and install concrete shafts for the GL channel,

— approx. 95 pcs Supply and install concrete shafts for SW channel.

Road works (construction road):

— loosen, load and process approx. 11 000 m3 topsoil,

— loosen and laterally store approx. 4 000 m3 of the upper floor,

— approx. 8 250 m3 improve and install soil excavation,

— produce approximately 41 200 m2 of planum,

— supply and install approx. 4 590 m of planned drainage,

— supply and install about 40 000 tonnes of natural stone crushed stone,

— supply and install approx. 4 400 t AC 22 T N base layer,

— deliver and set approximately 310 road flows,

— produce approx. 5 850 m of ballast banquets,

— supply and route approx. 1 050 m connecting cables DN/OD 160,

— Supply and install approx. 5 150 m2 water-based topcoat.

Laying for rain retention basins:

— loosen, load and process approx. 2 850 m3 topsoil,

— loosen approx. 12 150 m3 ground excavation,

— approx. 8 150 m3 of excavated soil,

- approx. 650 m 3 Dispose of excavated soil,

— supply and install approx. 1 throttle structure,

— supply and install approx. 850 tonnes of natural stone crushed stone,

— Supply and install approx. 1 100 m2 water-based topcoat.

Arrangance insulation wall:

— loosen, load and process about 400 m3 of topsoil,

— loosen the surface of approx. 850 m and store it sideways,

— approx. 2 400 m3 noise barrier removal,

— Improve and install approximately 8 200 m3 of soil excavation.

Download full details as .pdf
The Buyer:
Gemeinde Senden
CPV Code(s):
45221250 - Underground work other than tunnels, shafts and subways
45232410 - Sewerage work
45233120 - Road construction works