Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
08 July 2022
Closing Date:
30 August 2022
Location(s):
CH0 SCHWEIZ/SUISSE/SVIZZERA (CH Switzerland/SCHWEIZ/SUISSE/SVIZZERA)
Description:
Rack and pinion section Lungern-Käppeli, master builder incl. track construction

The rack and pinion section to be renewed (metre gauge railway with rack) lies between Lungern and Käppeli. The project perimeter is very cramped to the left and right of the track.

The section will be renewed including drainage.

A retaining wall made of natural stones on the mountain side is replaced by a permanent nail wall.

Excerpt Main Works

Track dismantling incl. rack 1'700 m

Turnout disassembly, interim storage and installation 1 pcs

Excavation 4'800 m3

Demolition of natural stone wall 55 m3,

Catenary mast foundations 55 pcs, cable duct 3'460 m

Fundationsschicht ca. 1'050 m3

Sperrschicht AC Rail 710 to

Asphaltgranulat 320 to

Gravel Class 1 4'000 to

Laying track incl. rack 1'700 m

Catenary mast foundations 48 pcs

Cable duct block, duct, shafts

Drainage (type 3c) 950 m, shafts, half shell (concrete)

Level crossings (Strail) 5 pcs

Installationsplätze 2'500 m2

Nail wall incl. natural stone masonry 220 m2

Banketthalterung Ribbert Ökogitter 240 m

Steel construction cantilevered service route 140 m

The rack and pinion section to be renewed (metre gauge railway with rack) lies between Lungern and Käppeli. The project perimeter is very cramped to the left and right of the track.

The section will be renewed including drainage.

A retaining wall made of natural stones on the mountain side is replaced by a permanent nail wall.

Excerpt Main Works

Track dismantling incl. rack 1'700 m

Turnout disassembly, interim storage and installation 1 pcs

Excavation 4'800 m3

Demolition of natural stone wall 55 m3,

Catenary mast foundations 55 pcs, cable duct 3'460 m

Fundationsschicht ca. 1'050 m3

Sperrschicht AC Rail 710 to

Asphaltgranulat 320 to

Gravel Class 1 4'000 to

Laying track incl. rack 1'700 m

Catenary mast foundations 48 pcs

Cable duct block, duct, shafts

Drainage (type 3c) 950 m, shafts, half shell (concrete)

Level crossings (Strail) 5 pcs

Installationsplätze 2'500 m2

Nail wall incl. natural stone masonry 220 m2

Banketthalterung Ribbert Ökogitter 240 m

Steel construction cantilevered service route 140 m

Download full details as .pdf