ventilation
• Installation of a ventilation unit with ventilation unit, 25000m³/h
• Installation of an outdoor air intake tower
• Installation of a ventilation system to ventilate a battery room
• Installation of ducts angular, approx. 1800 m²
• Installation of ducts angular tightness class D, approx. 730 m²
• Installation of ducts around DN100 to DN250, approx. 2,000 m
• Installation of fire dampers, approx. 220 pcs.
• Installation of volume flow controller, approx. 450 pcs.
• Installation of pipe silencer, approx. 450 pcs.
• Installation of air inlets and outlets, approx. 470 pcs.