The 005 - Landschaftsbauarbeiten
Construction site set-up, preparatory work and demolition
- Deliver and maintain 300 m of construction fence, implement 800 m of construction fence
- 10 pcs boundary point protection
- 30 m barrier fence plastic
- approx. 600 pieces of trunk protection (of which 400 pieces for StU 0.5 to 1.0 m)
- Approx. 35,500 m² of extensive mowing
- Clear 45,500 m² construction site of loose garbage/waste
- 370 m demolition of gas pipeline
- 350 m demolition of underground cable low-voltage line
- 350 m demolition fence underneath. Materials plus posts and foundations
- 25 m demolition of railway tracks
- 60 pieces of demolition of railway sleepers concrete
- 2,800 m² demolition of in-situ concrete surface course
- 2,800 m² demolition of asphalt surface course
- approx. 650 m demolition of edging concrete curbs
- approx. 375 m demolition of granite borders - disposal of all materials (according to disposal concept)
Open spaces and compensatory planting + waterside development corridor
- mow approx. 26,500 m² of tall perennial growth
- approx. 26,500 m² production of black fallow land
- Transport approx. 11,000 t of excavated and removal material to the recycling site (according to disposal concept)
- approx. 26,500 m² of soil loosening and terrain modelling
- 5,000 m³ earthworks
- approx. 6,500 m² Oberbodenarbeiten
- approx. 8,000 m² foundation of substructure
- Supply and install 1,600 m³ of recycled building material
- approx. 3,000 m² Asphalt pavement
- approx. 620 m² Manufacture superstructure natural stone small stone
- approx. 650 m² Herstellen Bedecking Wassergeb. Path surface
- approx. 2,500 m Manufacture of edge edgings under different sizes Materials
- 120 m³ Manufacture deadwood pile
- 16 pcs. make seating elements
- approx. 500 m Preparatory work street lighting
- Deliver and plant 96 pieces of standard trunk
- Deliver and plant 4,000 shrubs - approx. 24,500 m² sowing with various shrubs Seed mixtures - completion care and subsequent 2-year development care
Premiumradweg
- 37 pcs plate load tests control test
- Dissolve 2,500 m³ of soil and substructure materials
- Produce approx. 4,500 m² of flat surface
- Transport approx. 6,000 t of excavated and removal material to the recycling site (according to disposal concept)
- 165 pcs. Rootstock clearing undermined DU - approx. 4,000 m² Manufacture Cycle path Asphalt construction including edge sealing, blunting and cleaning - approx. 300 m³ Manufacture Banquet
- approx. 150 m of 3- and 5-line natural stone paving
- Approx. 2,000 m of line work Installation of cable conduit
- Supply and install 45 support brackets
- approx. 2,000 m Seitenmarkierung
- approx. 2,000 m² Anssat